on 03-19-2015 5:27 PM
Dear All,
Need your urgent help to solve a issue. I need to perform inspection of material after specified interval of time for which i am using stability study process. Following are the steps which i have followed :
1) Create initial sample (physical sample created)
2) Confirm initial sample
3) Initial test inspection lot( Inspection lot created )
4) Complete initial test
5) Specify storage conditions (Physical sample created with CRTD status)
6) Create testing schedule( Maintenance schedule is created )
7) I have scheduled maintenance plan through IP10 tcode. All the calls are getting generated.
Now i have given manual call in IP10, but inspection lot is not generating.
Please help to solve this issue ASAP.
Did you activate the inspection types of the 16 series in the material master?
Craig
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
User | Count |
---|---|
85 | |
7 | |
6 | |
4 | |
3 | |
3 | |
3 | |
3 | |
3 | |
2 |
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.