Hello All,
It will be of great help if somebody can share some examples on extended Safety stock planning methods(BT,BS,AT,AS). I have tried SAP help and SCN but none of them contains the actual calculation logic. I would require the calculation logic along with some examples.
I would like to validate the numbers when I configure the system and generate the number safety stock numbers.
Dear Abhijt
Did you checked the following link.
It´s difficult to provide the examples as you are require to consider the multiple factory.
Extended Safety Stock Planning - Supply Network Planning - SAP Library
Thanks
Amol