Is it possible to have time-based assembly scrap in the Product Master?

70% scrap effective until 4/30/07

60% scrap effective from 5/1/07-6/30/07

etc

or is it only possible to have time-based scrap in a PDS?

thanks

Accepted Solutions (0)

Answers (1)

Answers (1)

Former Member
0 Kudos

Hi Richard - you are correct, time based assembly scrap cannot be maintained in the product master (or material master). Time based scrap can be maintained in a PDS or PPM.

Andy

Former Member
0 Kudos

Hi

SAP Note:

390850 Scrap in APO and R/3 (documentation)

Helps you more.

Kind regards,

sundar