on 04-10-2007 2:51 PM
Is it possible to have time-based assembly scrap in the Product Master?
70% scrap effective until 4/30/07
60% scrap effective from 5/1/07-6/30/07
etc
or is it only possible to have time-based scrap in a PDS?
thanks
Hi Richard - you are correct, time based assembly scrap cannot be maintained in the product master (or material master). Time based scrap can be maintained in a PDS or PPM.
Andy