D Friends,
We’ve 2 scenarios:
Scenario 1: A Scheduling Agreement is created for Plant 1 for Mat X- qty 100. System gives Material Availability date as 9-Mar-15 for the schedule line. But material is not delivered till 10-Mar-15. So if we see mat. avail date in VA33 for the sch line on 10-Mar-15, system shows 10-Mar-15. If mat is not delivered on 11-Mar-15, system is showing mat. avail date 11-Mar-15. It means that if mat. is not delivered, then system keeps on moving the mat. avail. date to current date.
Scenario 2: Another Scheduling Agreement is created for Plant 2 for Mat Y- qty 100. System gives Material Availability date as 9-Mar-15 for the schedule line. But material is not delivered till 10-Mar-15 and if we see mat. avail date in VA33 for the sch line on 10-Mar-15, system shows 9-Mar-15. If mat is not delivered on 11-Mar-15, then also system shows mat. avail date 09-Mar-15. In this case material availability date is fixed.
In both the scenarios Sch line categ is same, Avail check in both the material masters is same, Material type is same. MRP type is different. Strategy groups are also different.
My concern is that in Scenario 1, why material availability date is moving to current date if not delivered and how to stop it.
Thank you.
Hi all,
Problem found. Too much thanks to all of you. Responsible prog. was SDV03V02. Hence closing the issue.
Thank you.
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
What do you see in the scheduling agreement itself? (Transaction ME38.)
When in the source list the MRP indicator is set to 2 (and the scheduling agreement is set too), then the MRP might change the scheduling according to the later delivery. Since with this the availability date of the material does change, yes you should see this in the sales order.
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Friends,
Any suggest. Can it be possible by rescheduling V_V2?
Thank you.
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Hi,
We've plant specific materials. Consumption mode & Forward Consp per fields in MRP3 view are maintained as follows:
Mat X (SSD…) | Mat Y (516..) | |
Consump mode | 2 | 2 |
Forward Consp per | 6 | 24 |
Plant | Plant 1 | Plant 2 |
In Plant 1, the mat. avil date keeps on advancing to current date. But in Plant 2 it stops. Can you pl suggest any thing on it.
Thank you.
Friends,
To check if V_V2 is responsible for changing Material Avail date, I tested a scenario.
I took an Order with qty 100. But confirmed qty in Schedule line was 0 because there was no stock. I created stock and then executed V_V2. But even after running V_V2, the confirmed qty @ sched line was zero. What I'm missing?
In IMG, the Default Settings for Avail check for Sales Area is unchecked for all Sales Area. Pl help me to analysis why Material avail date is moving.
Thank you.
Hi Chintan,
To ensure whether V_V2 is making the mat. avail date change, I tested a scenario as follows:
Although V_V2 is showing that confirmed 50 qty from customer 8306 was taken away and allocated to customer 8014. But when I see the order of customer 8014, schedule line is showing confirmed qty as 0. It should be 50 now. Isn't it? Is something else required to be done after V_V2? What is missing, pl let me know. Do I have to run V_R2 also? Pl help, I'm struggling since 15 days and could not find the reason.
Thank you all.