How to set OvSts.ShCostCal 'B' to "C" (Overall status shipment cost calculation)

Former Member
0 Kudos

Hi SD experts,

I have created shipment document and settled the shipment cost calculation as fully transferred.

I am facing problem in billing creation  (VF01)  system giving  below error

When i check the shipment document the overall status of shipment cost calculation showing partially completed (B).How to complete this 'Completely processed'(C)

.

Thanks in advance

PB

Accepted Solutions (0)

Answers (2)

Answers (2)

former_member183424
Active Contributor
0 Kudos

What is the status showing in VT03N ?

Refer to this OSS note  653014 - Info: Shipment overall status of calculation is 'B'

Lakshmipathi
Active Contributor
0 Kudos

There would be "Transfer" check box under "Settlement tab".  Ensure this is checked.

G. Lakshmipathi