cancel
Showing results for 
Search instead for 
Did you mean: 

SAP_PP_Q001 Heuristics Inbound quota

Former Member
0 Kudos

Hi Gurus,

I have 2 PDS's for a FG and I created Inbound quota for the header andused the Heuristics - SAP_PP_Q001 but I do not get the desiredoutcome.

I get the error message

"PEGGING RANGES COULD NOT BE PLANNED

Message no. /SAPAPO/RRP_HEUR032"

Can anyone please guide me

Regards,

SCMLEARNER

Accepted Solutions (1)

Accepted Solutions (1)

Former Member
0 Kudos

Hi

Did you try running any other heuristic like the SAP_PP_002 – planing standard lots or SAP_MRP_001 in background or interactively in product view  /sapapo/rrp3)?

If these other runs work, then you have issue with the quotas you created. Check the validaity dates and all other settings in quotas.


If these other runs too do not work, then you have issue with your PDSs or the resources itself. Run the master data consistency checks and see if the location-products, quotas are all assigned to active model or not.



Answers (0)