on 03-04-2015 8:20 AM
Hi Friends,
I have started SUM with SP12 Patch9. i have selected the correct stack.xml file which was generated by MOpz during patch download.
But in SUM i am able to see only Java tab, the Abap tab is not coming.
The xml file consists of all abap information and the SP's are downloaded in the same directory.
Please help me on this.
Thanks & Regards,
Praveen
Hi Praveen,
In SUM i am able to see only Java tab, the Abap tab is not coming.
Could you share snapshot for same.
Regards,
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Hi All,
In SUM SP12 guide i came to know that ,
SAP Business Suite 7i2011 is the last SAP Business Suite release with dual-stack support:
That is, as of SAP Business Suite 7i2011, it will no longer be possible to upgrade a dual-stack SAP Business Suite system to a higher release.
Therefore, SAP recommends you to move away from dual-stack SAP systems where possible.
So first i have to split my SAP dual-stack system and do only abap upgrade.
I will come back if i get any issues.
Thanks SAP.
Regads,
Praveen