cancel
Showing results for 
Search instead for 
Did you mean: 

Assignment of more than one storage bin to one work center

Former Member
0 Kudos

Dear experts,

when difining the master data attributes for one work center there is possibility to assign this work center to one storage bin:

In my case the work center has to be assign to 3 storage bins (which of them is also a PSA).

Could you give me any hit how to do this in the best way?

Thanks in advance and best regards

Denis

Accepted Solutions (1)

Accepted Solutions (1)

JuergenPitz
Product and Topic Expert
Product and Topic Expert
0 Kudos

Hi,

an assignment to more then one bin is not possible. Why would you want to do this?

Brgds

Juergen

Former Member
0 Kudos

Hi Juergen,

I was thinking about this because I have 3 PSAs which are also bins. All of these PSA are belonging to one work center.

That is why I asked, but now I think that the information from the production material request with the PSA ist enough to control where the single component has to be transport to.

BR

Denis

JuergenPitz
Product and Topic Expert
Product and Topic Expert
0 Kudos

Hi,

do you mean a work center from ERP Production? This one is not assigned to the bin anyway. And the EWM work center has no connection to ERP Production or a PSA.

Brgds

Juergen

Former Member
0 Kudos

Hi Jürgen,

no, I mean the work center been created in EWM without any connection to ERP. But I have found my misstake. Thank you very much for you help!

BR

Denis

Answers (0)