on 02-20-2015 12:15 PM
Hi,
I'm trying to do a GR using LB11 but when I try do execute TO in background I receive this error in the log.
"Decision required for sample quantity in foreground processing"
Trying in foreground I have in following message: Inspection sample quantity must be greater than 0 for this processing.
May I have a missing configuration in the strategies?
I need to do this on background.
I just found that the interface QM-WM was not fully configured in SPRO.
The interface control WM-QM was not set correctly for the storage Type search sequences.