BADI to change the PDS priority in ECC

former_member282968
Contributor
0 Kudos

Need to change the priority of the PDS during CIF. Please suggest the BADI which can be used in ECC side.I guess BAdis /SAPAPO/CURTO_SNP and /SAPAPO/CURTO_CREATE.can be used in APO. I need to change PDS value in ECC side while doing CIF or CURTO_CREATE..

With thanks & regards,

naveen


Accepted Solutions (0)

Answers (1)

Answers (1)

marianoc
Active Contributor
0 Kudos

Hi Naveen,

As far as I know, in ECC the PDS is represented by the Production Version.

We don't have a priority to be assigned directly in the Production Version in ECC. The PV determination in ECC can be managed by the locking indicator, the lot sizes, the validity periods and the sequence in which the PV was created.

It can be possible to assign a priority thru a Quota Arrangemenet.

Production Version Selection - Process Orders (PP-PI-POR) - SAP Library

Kind Regards,

Mariano

former_member282968
Contributor
0 Kudos

Hi Mariano,

Like how  the PDS is maintained in PDT_MAINT using the production version maintenance, where using the change option priority is changed, I want the similar option to be done through an enhancement while importing to APO either while doing CIF or CURTO_CREATE.This is to give priority to PDS than PPM.

With thanks & regards,

Naveen.

marianoc
Active Contributor
0 Kudos

Hi Naveen,

Check this thread, here you have the solution:

http://scn.sap.com/thread/471898

Kind Regards,

Mariano