cancel
Showing results for 
Search instead for 
Did you mean: 

Unable to retrieve EP role to assign to user in access request.

former_member272370
Participant
0 Kudos


ISSUE --->  Unable to retrieve EP roles to assign to user in access request. Please provide inputs to make progress.


1) I get the below message " NO DATA FOUND" on executing Synchronize EP SMPL SCHEMA job.


          Have referred the below link pointing to my error message.

          http://scn.sap.com/thread/3188380

          Do I still need to consider the notes 1727530 and 1655074 even when we are on GRC 10 SP16 currently.


2) On running the Repository sync, the message displayed is the below:



17.02.2015                                                    Program for Repository Profile Syncronization                                                            1

------------------------------------------------------------------------------------------------------------------------------------------------------------------------

Processing for connector GRCEP

Profile Range returned as empty for GRCEP connector, reason

Starting profile sync for connector GRCEP and language EN

Sync completed for connector GRCEP

Profile sync successfully executed

17.02.2015                                                     Program for Repository Role Synchronization                                                             1

------------------------------------------------------------------------------------------------------------------------------------------------------------------------

Processing for connector GRCEP

Starting role sync for connector GRCEP and language EN

Fetch criteria: sign = I option = BT low = 0* high = 1*

Date range from: 19.700.101.000.000 To: 20.150.216.185.316

Fetch criteria: sign = I option = BT low = 2* high = 3*

Date range from: 19.700.101.000.000 To: 20.150.216.185.316

Fetch criteria: sign = I option = BT low = 4* high = 5*

Date range from: 19.700.101.000.000 To: 20.150.216.185.316

Fetch criteria: sign = I option = BT low = 6* high = 7*

Date range from: 19.700.101.000.000 To: 20.150.216.185.316

Fetch criteria: sign = I option = BT low = 8* high = 9*

Date range from: 19.700.101.000.000 To: 20.150.216.185.316

Fetch criteria: sign = I option = BT low = A* high = B*

Date range from: 19.700.101.000.000 To: 20.150.216.185.316

Fetch criteria: sign = I option = BT low = C* high = D*

Date range from: 19.700.101.000.000 To: 20.150.216.185.316

Fetch criteria: sign = I option = BT low = E* high = F*

Date range from: 19.700.101.000.000 To: 20.150.216.185.316

Fetch criteria: sign = I option = BT low = G* high = H*

Date range from: 19.700.101.000.000 To: 20.150.216.185.316

Fetch criteria: sign = I option = BT low = I* high = J*

Date range from: 19.700.101.000.000 To: 20.150.216.185.316

Fetch criteria: sign = I option = BT low = K* high = L*

Date range from: 19.700.101.000.000 To: 20.150.216.185.316

Fetch criteria: sign = I option = BT low = M* high = N*

Date range from: 19.700.101.000.000 To: 20.150.216.185.316

Fetch criteria: sign = I option = BT low = O* high = P*

Date range from: 19.700.101.000.000 To: 20.150.216.185.316

Fetch criteria: sign = I option = BT low = Q* high = R*

Date range from: 19.700.101.000.000 To: 20.150.216.185.316

Fetch criteria: sign = I option = BT low = S* high = T*

Date range from: 19.700.101.000.000 To: 20.150.216.185.316

Fetch criteria: sign = I option = BT low = U* high = V*

Date range from: 19.700.101.000.000 To: 20.150.216.185.316

Fetch criteria: sign = I option = BT low = W* high = X*

Date range from: 19.700.101.000.000 To: 20.150.216.185.316

Fetch criteria: sign = I option = BT low = Y* high = Z*

Date range from: 19.700.101.000.000 To: 20.150.216.185.316

Sync successful for connector GRCEP, language EN and total count : 0

Sync completed for connector GRCEP

Role sync successfully executed

17.02.2015                                                     Program for Repository User Synchronization                                                             1

------------------------------------------------------------------------------------------------------------------------------------------------------------------------

Processing for connector GRCEP

Starting user synchronization for connector GRCEP.

Sync successful for connector GRCEP and total count: 0

Sync completed for connector GRCEP

User sync successfully executed

Sync successful for connector GRCEP

Repository Object sync job successful

Accepted Solutions (0)

Answers (2)

Answers (2)

japneet_singh2
Active Participant
0 Kudos

Hi Arun,

Please refer to the note 1848215 and make sure that the connector mapping should be done correctly.

BR, JP

former_member272370
Participant
0 Kudos

Hi All,

Thanks for all the replies !

Followed note 1647157 to fix the issue.

Regards

Arun

madhusap
Active Contributor
0 Kudos

Hi Arun,

You can go through below discussion threads where you can find more details about this issue.

Regards,

Madhu