Hi,

Packing has already been configured in the system. I still am in doubt about using it correctly. there are 3 packing material A, B, C which are defined. Now i want to pack SAY 2000 materials totally, A contains 100 each(so we have 20 A's), B contains 10 A's (So we have 2 B's) and C contains the 2 B's. I am stuck up at the first stage itself( packing A's). It would be great if anyone could help me in this regard.

thanks

Accepted Solutions (1)

Accepted Solutions (1)

Former Member
0 Kudos

hi

where is the difficulty.

Mark the 2000 materials -- write 100 into the open field

mark the first A

say packing -- it will remail umpacked 1900 materials.

Redo this 20 times.

Goto packing of HU's

further on : mark 10 A's -- mark one B an say packing

redo once

then mark 2 B's an mark one C -- say packing -- it's done.

You can do the packing too with Idoc's. But you will get problems, if you hae such a deep packing-structure. The delivery note will be blocked, if you have lot's of bocking at a time.

hope it helps

hans