on 02-13-2015 6:32 AM
Hi Friends,
I need to configure RA for cross company code valuation for the below.
Scenario :
If a level 1 wbs has a company code 2000 with RA key assigned to it and the level 2 wbs has a company code 3000 with RA key assigned to this also, What happens here in this scenario and How is POC calculated here ?
Does RA calculate a POC specific for the Level 2 wbs. Is this included in the POC of the Level-1 wbs also?
i believe the configuration required here is to set the indicator for cross company code valuation in RA Version.
or is there a different method to implement this scenario with two different company codes residing on one parent company code project. POC and revenue recog has to be identified for the same.
Please advise on the scenario and config settings to maintain and share your thoughts !
Thanks !
RA will roll up the costs and revenues for subordinate WBS elements as long as they do not have a RA Key and if they belong to the same company code. In your scenario the 2 WBS elements are calculated independently.
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Hello,
RA is always a Company Code specific process due to the possibility of financial postings. I think that your WBS structure better be reconsidered not to mix up different Company codes at different levels, but maybe having a parallel nodes for different Company codes.
I also believe there is a consulting OSS note to explain the standard system behavior, just search the OSS.
Since you already have a master data in place it must be quite easy for you to test how the system behaves.
Regards,
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
User | Count |
---|---|
99 | |
11 | |
11 | |
6 | |
6 | |
4 | |
4 | |
3 | |
3 | |
3 |
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.