cancel
Showing results for 
Search instead for 
Did you mean: 

SAP CRM configuration node is not visible

0 Kudos

Hi,

I been assigned to configure the SAP CRM at my current assignment but when I navigated to SPRO, there is no CRM node.

Please see the attached screen and suggest me if I need to activate any components so that CRM node displays and I can configure.

Thanks,

Arvind

Accepted Solutions (0)

Answers (3)

Answers (3)

Former Member
0 Kudos

HI Arvind,

Check below link. This might be helpful to you.

http://www.saptechnical.com/Tutorials/ExitsBADIs/IMG/Index.htm

Rgds,

Ankit

former_member182985
Contributor
0 Kudos

Hi Arvind,

First, you need to check if the CRM is installed successfully. As Rakesh mentioned, you need to check the system status. You can click on "system"-> "status". I attach a screenshot for you.

Secondly, if the CRM system is installed successfully, you would need to look at the following notes

which explain how to regenerate the IMG:

130688  - Project IMG must be regenerated after an upgrade

42272   - IMG problems after upgrade

690652  - Customizing notes are missing after an upgrade

Hope the information helps.

Thanks,

Julin

Former Member
0 Kudos

Hi Arvind,

Can you check the system status if CRM is installed properly.

Cheers,

Rakesh..

sapisurdg.wordpress.com

0 Kudos

Rakesh,

can you provide more details on how to check the status, is there any tcode or table that I need to look into.

Thanks for your help.