I want to set an example of FQC (Final quality control) for a material.
After I actived a QM view with the 04 inspection type ,
I created MIC ,sampling procedure 100% inspection Attributive inspection nonconf.units ,
Inspection plan usage 5 GR status 4 release ,using a workcenter , control key QM01 ,MIC ,sampling procedure.
I created production order for this material by CO01,
and I confirm the production order ,receive the Goods.
My issue is I can not got any inspection lot from QE51n, it showed No entries found.
By using Tcode QA32 , I have got the inspection lot .system status is CRTD CHCR SPRQ ,I can not do the UD (the function you selected cannot be carried out !).
If I using Tcode QA02 ,the Inspection lot origin 04 ,inspection type 04 ,the tab Insp.Specifications click task list /spec. Big issue comes: NO Inspection plan could be found(Message QA 278 )!
I have check the inspection plan ,the task list shows the usage 5 status 4 / from lot size 0-99999999/ UOM always PC / Valid from yesterday Valid to 999/12/31
in the SPRO the 04 inspection types 04 Task list usage 5
I really create the inspectionplan for the material ,why the system said no inspection plan could be found !
Best wishes!
Miriam Zhao
Hi, Seems that you have already checked the respective points! Additionally could you check below also?
Anand
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
HI,
check the changed on date of the Inspection plan on header tab, make change on date = key date
change key date manually of lot.It will work. Revert back.
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Hi Zhao,
I might appear strange here but my eyes caught few things and I'm bit suspicious. Why do you keep posting the same content again and again. You responded to Arijit (on his two suggestions) four times with same response.
Besides, why do the font of System status, Key date and Usage is different from rest of the page ?
Inspection lot with CRTD status is not very rare issue and everybody has provided almost all the possible causes. You must respond to Anand's questions and also read his following document!
Inspection lots with CRTD status- Causes and Remedies
ntn
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Hi Miriam,
Just a blind guess here. When you double check the feedback form Anand and Nancy, please can you also check if your "inspection plan" is created for the same "PLANT" where the inspection lot got created or not.
Thanks,
Arijit
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Hi Zhao,
Please can you try creating an 89 type inspection lot manually and see if there is any issues. Please maintain the required master data, QM view, etc and then execute. This will help us understand if this issue is only coming for 04 inspection type or for all inspection types.
You may need to take technical team's help to figure out where this issue is coming form.
You may try checking some of the below notes if applicable -
374931 - Inspection lots in status CRTD; without determined sample
139968 - Inspection lot has status 'CRTD' instead of 'REL' (this is some what similar note like KBA - 2112741)
Thanks,
Arijit
Hi Miriam,
Check table MAPL and see if the material is assigned to the inspection plan and valid date is after the GR date.
Check your system with KBA
Regards,
Nancy
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
User | Count |
---|---|
99 | |
9 | |
9 | |
5 | |
4 | |
3 | |
3 | |
3 | |
3 | |
3 |
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.