cancel
Showing results for 
Search instead for 
Did you mean: 

DMR at char. level for all materials assigned to the Insp. Plan

Former Member
0 Kudos

Hi all,

We're using a DMR at characteristic level (only for 2 characteristics in a inspection plan of 4) that allows enter results at the very first inspectioin lot created each day per material.

It's working fine pear each material, but we would like to have is the skip status would be set to all materials assigned to that inspection plan.

I mean, if A and B materials are assigned to this inspection plan and we create the following inspection lots, the system works in this way:

Material - Lot - Skip status

A - L1 -  Not Activated (Results must entered)

A - L2 - Activated (Results cannot be entered)

B - L3 - Not Activated (Results must entered)

and we would like to have is:

Material - Lot - Skip status

A - L1 -  Not Activated (Results must entered)

A - L2 - Activated (Results cannot be entered)

B - L3 - Activated (Results cannot be entered)

So at the end we want to enter results one time per day in some specific inspection characteristics of all materials assigned to the same insp. plan.

Can this be achieved?

Thanks upfront

Accepted Solutions (0)

Answers (1)

Answers (1)

Nancy
Product and Topic Expert
Product and Topic Expert
0 Kudos

Hi Diego,

See if you can achieve it by the SAP Enhancement QDSE0001.

Regards,

Nancy