on 01-27-2015 4:38 PM
Hello Experts,
We have an issue during GR QM certificate and cannot find any similar solution on SDN.
Here is our problem ---
We did a GR for Purchase Order with QM Certificate required active and it works as expected.
For the second GR for the same purchase order and same batch we get below shown error -
Message no. QA313
In Material Master in QM we have
QM Proc active - Checked
Control key - Maintained
Certificate - Maintained
Inspection Type - 01 - Lot creation for material, batch and storage location.
Please advise if there is missing.
It's a critically issue and we would highly appreciate your prompt feedback.
Thanks,
Parth
Hi,
Pl share a snapshot of the Certificate type: Details.
ntn
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Hi Parth,
Vendor's QM > Insp. control is Inspection active, if vendor is not certified?
Regards,
Natália
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Hi Parth,
Check the following IMG activity path
IMG
>Quality Management
>>QM in Logistics
>>>QM in Procurement
>>>>Define Keys for Certificate Processing
Define Certificate Types
Control without certif.
e.g.: 'Without lot: Blocked stock'
F1 Help:
"Control if Certificate Is Not Available
Type of control used by the system if the certificate required at goods
receipt is not provided. The deciding factor is whether or not an
inspection lot is created at goods receipt.
The system allows for the following cases:
- With lot: Status in inspection lot Without lot: Blocked stock
- With lot: Status in inspection lot Without lot: Error message
- With lot: Error message Without lot: Blocked stock
- With lot: Error message Without lot: Error message
- With lot: Status, no skip-to-stock Without lot: Blocked stock
- With lot: Status, no skip-to-stock Without lot: Error message
- Warning
- Information
Dependencies
If you set the indicator Inspection lot for several material items in the material master,
in certain circumstances the system does not create an inspection lot when a partial or
follow-up delivery is received. As a result, the system sends an error message.
Regards,
Natália
User | Count |
---|---|
108 | |
12 | |
11 | |
6 | |
5 | |
4 | |
3 | |
3 | |
3 | |
3 |
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.