on 04-05-2007 6:02 PM
Hi,
we have installed PI SR2 and we have XI system as central SLD and solution manager which on diff sever as local sld.
can we have PI system as local sld ?
when i tried to run the NWA template in deploy and change then the process is failing at steps 7 and 8. How to configure SLD in this case. How did u resolve this issue
any help to resolve this issue would be appreciated
Regards,
k s reddy
SAP note 939892 addresses the problem and gives a solution
Essentially you have to manually run the rest of the steps. I had the same exact problem. I was installing PI and registered it into the central SLD which is hosted on Solution Manager server.
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Hi Harrison,
while installing PI where we need to install central sld. I have PI on one server and solu manager on another server.
can u plz explain where are the local and central slds ? I have selected central sld for PI box and local sld for solu manger box. Is it correct or i need to do viceversa
Help in this issue would be greatly appreciated
Thanks,
k s reddy