Hello,
I'm having a challenge that I shouldn't be this difficult and was easy to set up in 7.0. We are now on 7.1 SP11.
I need to default the Sold-To Party on ZMCR, but it is not defaulting. It should default based on the ibase.
Here are my details:
1) There is no preceding document. ZMCR is the start of the ChaRM flow.
2) IB52 is setup....
3) The partner 151 in IB52 points to top of PPOMA_CRM...
and BP 151 is setup as a Sold-To Party in tcode BP...
4) Partner determination is currently using access sequence 0018.
But I have also tried access sequences AIC2 and AIC3. None of them work.
5) I found OSS note 1165357 . It says ... "
But in 7.1 SP11, the IMG task title does not include "Change in the Past".
But, looking at the task, it is missing one of the fields in the note. It is missing column "IB Past".
I set column PInherit per the note, but have not made any change for IB Past. I'm not sure if this part of the issue or not.
I have a feeling it is just the access sequence, but none are working so far.
Any ideas?
Thank you in advance for your help!
Well, this IB52 solution is no longer working. We went to SP13 last week and the determination no longer works. Good new is that BRFplus worked! Since we only have one Sold To Party setup, I defined the decision table to check for ZMCR. I'll try to write a post about it soon.
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Thanks for the update Robyn. I was also not able to get IB52 to populate the Sold-To in ZMCR. I'm on SP12. I have an incident open with SAP open for 2 weeks + now.
I also think that BRF+ is the way to go too, but didn't have the time to look into it. Will be excited to see your post.
Thanks,
Roy
Hi Robyn,
we were you able to achieive this
we are on solman 7.2 sps 6.
regards,
Elizabeth
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Hi Robyn,
the defaulting of a partner function (your Sold-To-Party) by partner determination works only for the ibase which is assigned to your RfC.
An RfC always gets the ibase of the solution manager as a default value, as i mentioned in my last post.
Any entries in the scope are not considered for this functionality, which is right, because you could have several different ibase componentes in your scope.
The difference to 7.0 is that you had to assign an ibase in the RfC directly. This was changed with 7.1, where the RfC does not need an ibase, since it could be an cross system change. So the ibase gets assigned to the change document on creation based on the scope entires, the RfC itself gets an 'dummy' ibase for technical purposes only.
Hope this helps,
Christoph
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Hi Raufman,
In 7.1, using the IB52 partner (like I was using) will only default the sold to party to the ibase partners of the SolMan system, not the ibase component selected in the RfC scope. I changed our strategy to go work with that. Since my client doesn't need more than one sold to party, I'm using the IB52 partner to default the value so the sold to party will be the same for all RfCs and I protected it in the UI.
If you need to have multiple sold to partys and you want to have them defaulted, it may be possible using BRFplus. I'm not sure though. If you try it, please let me know.
Thank for the suggestions that were posted. None of the suggestions have worked so far. I did find out more information though about the issue.
The ibase component that the sold to party determination is looking at is the ibase component assigned to SolMan itself. For example, the component assigned to SolMan that the RfC is created on is 1111 and the component assigned to the managed system in the scope is 2222. The sold to party determination is looking at the partners assigned in IB52 for component 1111. It should look at 2222.
I'm still looking into the cause. If anyone knows why it is looking at the wrong component, I would love to award points!
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Here is more information about this issue. I put a breakpoint in function module COM_PARTNER_DETERM_STEP_ONE_OW. It is not being executed after entering the scope on ZMCR. Since the ibase is auto-populated when entering the scope (based on the project), it should re-execute the partner determination, but it is not.
Another thought, if you are pre-filling Sold-To Party for ZMCR in 7.1, are you using an action with a rule parameter? If so, what is the rule?
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
I believe you can use a BRF+ rule to determine the Sold-to Party BP.
You can adjust the BRF Rule Service Team to Sold-to Party. I perfomed this in another implementation to fill the Change manager.
At the end, create an action based on SMIN_STD_FIND_TEAM_SEND_EMAIL (from SMIN) and change the parameter PARTNER_FCT to 00000001. Should be work (i never tried before with Sold to party, but i believe will work
Best Regards Issac
Hello
I have resolved this issue previously. In the Partner determination Procedure select Access Sequence for Sold to Party "Determination vai Ibase". There is a Trick here there will three entries with same Access Sequence try assign each one at a time and test.
This has been worked for me.. Award point if this is helpful
Regards
Bhaskar
Hi Robyn,
Since we never create RCs directly (only from IMs or PMs), I had not run in to your issue. However, one way to get the IBase Component default Sold-To business partner to populate is to enter the IBase Component in the Reference Object assignment block:
When I tested, the partner functions auto-populate after entering the above. However, I do not know how this entry will interact with the entry of the Project and Component in the Scope assignment block.
Kindest regards
Paul
Hi Robyn,
in your first screenshot you set the Sold-To Party for VB4 client 300.
Is this your solution manager client?
A change request gets per default the ibase component of the solution manager system, performed by this action:
So maybe you assigned your Sold-To Party to the wrong IBase component?
If not, maybe you have several IBase components for this system?
Best Regards,
Christoph
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Hi Vikram,
That thread was a bit different since I'm trying to determine the sold to party based on the ibase. Taking parts of that thread, I noticed their access seq had the "Determination as Business Partner" flag set. So, I copied AIC3 to ZIC3 and set that flag and update the partner determination to point to ZIC3. It did not work though.
I haven't needed to do this since 7.0 and I remember it being easy then.
Any other thoughts?
Dear Mrs, Robyn:
Did you tried change the default partner det procedure used in the IBASE?
The default to IBASE 01 is 000000032. Try to change to Y/ZMIN0001
IMG Path:
CRM > Master Data > Installed Base > Assign Partner Determination Procedure to Installed Base Category.
Try and give me a feedback
Kind regards
Issac
User | Count |
---|---|
86 | |
23 | |
11 | |
9 | |
8 | |
5 | |
5 | |
5 | |
5 | |
4 |
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.