on 04-05-2007 6:00 PM
Hi All,
Do you think its possible to do a system refresh for solution manager?
Even though we do, wont there be a lot of inconsistencies between satellite system and with new solution manager?
Ideally i need do system refresh of X solution manager to Y solution manager
Thanks
Gopal
Hi,
How about the consistency between your two X and Y systems. Are they in single TMS. Requests properly transported from X to Y? If its positive, then go ahead you can make System Refresh..
Feel free to revert back.
--Ragu