HI Guys,

i have tun info package for full load in qa system.  not data load in the PSA . Job has finished succesfully in source system but no error is BW side.

294 records showing in psa with yellow request.  In dev it is working fine.

Please any body help me what is the problem.

Regards

vikas

Accepted Solutions (0)

Answers (4)

Answers (4)

RamanKorrapati
Active Contributor
0 Kudos

Hi,

Yout saying PSA have 294 reocrds and yellow state.

What does it mean.

Your request loaded the data but request in yellow?

Please check ECC SM58. execute if any queues exist there.

make present request red and delete it.

Again run your full load info pack and see.

Thanks

Former Member
0 Kudos

Hi Ramanjaneyulu,

i have checked sm58 there is nothing stuck. i have checked the  and got some idea there some problem with source system. No idoc received from source system.  Checked BD87 t- code

idoc are failed and error message is partner profile not available.   Please help how i can resolve this issue. 

Do i need to check RFC destination connection parameter. from source i could not log in BW system via remote. do i need to connect with Basis team for the RFC and partner profile setup.

Regards

vikas

RamanKorrapati
Active Contributor
0 Kudos

Hi,

Seek basis team help and ask them make partner profile active in BW , T code - WE20.

its basis activity, please inform them.

Thanks

KodandaPani_KV
Active Contributor
0 Kudos

Hi,

which system you got the data if DEV or QAS?

if you got the error in pelase check the error message in the IPK.

Thanks,

Phani.

former_member214415
Active Participant
0 Kudos

Hii,

There can be multiple reasons for being your request in yellow in BW side:

1. Please check is there any TRFC got stuck  (T.Code: SM58)

2. Check in BW side ST22, It can be like memory or log space got full.

3. In infopackage --> scheduler menu --> set indicator as green when warning comes.

If every thing is fine than I hope you can convert this in green or as this full load try reloading again.

Let us know if still same issue.

Thanks,

Swapna

santosh_hiremath
Explorer
0 Kudos

Hi Saini,

Go to ST22 in source system and clear the job log for the jobs which are in red and yellow request.

Regards,
Santu

Former Member
0 Kudos

Hi Santosh,

There is no option in st22 for delete.    Any other reson why it is happening.

Regards

vikas