Single Purchase Req. Creation in MRP Run for varios dependent requirements

0 Kudos

Good day SAP experts

I have a question, when i run the MPS for the hole plant there are some FERTs that share the same packaging material , for example Ferts: 10001, 10002, 10003 and 10004 share the same package material with number 300100, whats happening right now is that when the Ferts generate a dependant requirement for the packaging material for example each FERT needs 10,000 EA when we run the MRP the system is generating 4 Purchase Req for the same material 300100:

-----------------------------------------------------------------------------------------------

Mat:300100

plant:2010

date           MRP/el        MRP element data           Reqmt   unit

20.12.14   PurReq          4500012634/00010          10,000   EA

20.12.14   PurReq          4500012635/00010          10,000   EA

20.12.14   PurReq          4500012636/00010          10,000   EA

20.12.14   PurReq          4500012637/00010          10,000   EA

--------------------------------------------------------------------------------------------------

The thing is i need that when i run the MRP instead of having all those Pur Req i need the system to generate just One Pur Req for the total , that is:

-----------------------------------------------------------------------------------------------

Mat:300100

plant:2010

date           MRP/el        MRP element data           Reqmt   unit

20.12.14    PurReq          4500012630/00010          40,000   EA

--------------------------------------------------------------------------------------------------

how can i achieve this?, can i do it with configuration or Bapis or with material master data?, thank you in advance for your kind help.

Kind Regards.

Accepted Solutions (0)

Answers (1)

Answers (1)

Caetano
Product and Topic Expert
Product and Topic Expert
0 Kudos

MODERATOR MESSAGE: This question has been asked several times on this forum and this system behavior is also described on the MRP consulting and FAQ notes.

Please do some research before opening a thread on this forum.