Multiple plants in MRP list/Stock List

Good morning.

Is there any way of having simultaneously multiple plants in MRP/Stock lists?

I have 53 plants, for which i need to see the stock situation in all of them, at the same time, if possible.

I have been across the following post,

Material Grouping and Cross-Plant View in the Stock/Requirement List(T-code MD04)

but it requires the activation of business function LOG_PP_LMAN. Is there any way, after running MRP in all 53 plants,

to have a consolidated MRP/stock list without activating any business function?

Thank you very much, in advance, for your help and input!

Best regards,

Nikos Giannopoulos

Former Member
replied

Hello Nikos

As far as I know, this is the only way to do that. Otherwise, you may create your own report using BAPIs BAPI_MATERIAL_MRP_LIST and BAPI_MATERIAL_STOCK_REQ_LIST.

Nevertheless, I think that you should test the business function activation. Besides the cross-plant view on MD04 there are other useful functionalities introduced by this business function and I can't remember of any negative effect of that. See the documentation below:

SAP Library - Production Planning and Control

BR
Caetano