PM order components Item category change

Former Member
0 Kudos

Hi,

Please help me to get suitable BAdI or user exit for PM order components item category change.

PM order component item category has to be changed from L to N based on Material master "Plant specific material status" instead of Material type. Since the same material type has to be procured from Vendor we need to raise PR--> PO instead of reservation. The change of L to N should be either at the time of PM order creation or release.

Regards,

senthil m

Accepted Solutions (1)

Accepted Solutions (1)

rakesh_mane
Active Contributor
0 Kudos

Hello

Please check User Exit CNEX0013

Br

Rakesh