on 12-22-2014 9:30 AM
Hello,
We have a requirement wherein standard cost estimate in plant 1 should be picked up in plant 2. we know that it is possible through transfer control. But the problem is in plant 1 overhead percentage is 10% whereas in plant 2 overhead % should be 13%. However through transfer control only overhead with 10% only is getting populated not 13% in plant 2.
Is there any configuration is missing? how to go about it.
Thanks in advance
K.G.
Hi
Is it same material in 2 diff plant?
Then you can't charge diff OH rate during transfer control because transfer control is for transferring same cost to other plant.
But can try by taking OH rate dependency OHtype/Plant combination where you can define Plant wise rate
Test it in your dev ...
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
User | Count |
---|---|
86 | |
7 | |
6 | |
4 | |
3 | |
3 | |
3 | |
3 | |
3 | |
2 |
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.