on 12-17-2014 7:43 PM
Hello All,
I have below scenario
I have one Plant and 10 storage locations which are single EWM warehouse managed.But these 10 SLocs are in 3 Physical buildings.Like below
Building 1-SLOC1,SLOC2,SLOC3
Building 2-SLOC4,SLOC5,SLOC6
Building 3-SLOC7,SLOC8,SLOC9,SLOC10
I have stock type and availability group for each storage location and configured accordinlgy.
Now the problem is if i have Material1 in both the storage locations like SLOC1 and SLOC2,how do i receive them into their respective storage locations and do the putaway.
Thank you
One Storage Location : 1 Availability Group.
While doing Storage Type configuration, ensure, one storage type is not spreed across multiple storage locations. and assign Availability group to your storage type.
I mean, you should assign, your availability group to your storage types.
Regards,
Sathish
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Hi,
I do not understand your problem.
You enter the destination storage location either in your PO or in your inbound delivery.
And if you do then what I described in the other topic where you had the same question, you get the material for the storage location into the respective storage type. If building means for you, that you also have different staging areas, then you need to build something, this is not covered in the standard.
Brgds
Juergen
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
User | Count |
---|---|
7 | |
4 | |
3 | |
2 | |
2 | |
1 | |
1 | |
1 | |
1 | |
1 |
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.