Batch Management

Former Member
0 Kudos

Hai all,

1. In the the step of Assign batch determination procedure and activate check.

(Here without activating check aslo it is allowing us to maintain manual entries)

Can any one explain the controls that are found in the strategy record T.Code VCHN1

1.What is exit to quantity proposal

2. What is ID for display UOM in batch determination

Regards ,

Siva

Accepted Solutions (0)

Answers (1)

Answers (1)

javed_ihsan
Active Participant
0 Kudos

Answer to your questions

Activating check here means that system will automatically pick the batches. If you want to manually enter the batch during transaction then you don’t need to activate this check.

What is exit to quantity proposal?

Exit to quality control means that you can assign a routine (requirement) to the relevant strategy type. This requirement specifies what quantities of what selected batches the system uses in order to fill the target quantity. For example if you want the system to pick only those batches with full pallet quantities,

What is ID for display UOM in batch determination?

Indicator for the unit of measure in which the quantities are displayed during batch determination. This can be either the basic unit of measure of the material or the unit of entry of the document for which batch determination is being carried out.

Hope this explains everything that you want, if helpful then you can grant me points.