on 12-02-2014 11:31 AM
Dear All,
I have 975 pcs as available stock (unrestricted), on booking sales order of 1000 pcs, availability check confirms only 975 pieces though i have open purchase orders having quantity more than 300 pcs. So i want that system should pick the balance 25 pcs from those open purchase orders. I have done changes in configuration through OPJJ whose screenshot is attached herewith. Pls tell, is there any changes required in configuration or is there anything which i can do in configuration so that i can get the desired result.
Regards
Deven
The Problem here is, the system is not proposing the dates for the full order quantity. Normally, availability check will propose the dates for whole of the order quantity, even if its not available in the stock, after considering the production/procurement time.
There must be some problem with the availability check configurations, or the MMR.
please check mrp1, mrp2, mrp3, mrp3 views and make sure data are properly maintained.
Also check the configurations of Availability check,
Reg
Jobi
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Hi Deven,
Check the checking rule,it is showing different value in two two different screen shot.
Regards,
Sanjit Bhattacharya
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Hi Deven,
In your screenshot there is the 'ATP quanitity" icon, click on that and paste that one here.
ITs CO09 as suggested by Noel
Reg
Jobi
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Hi Jobi,
I've checked and found one back order of qty 25 but it is already invoiced in back date and no more open sales order for that material. Also if i book one order of 1000 pcs for that material, it picks only 975 pcs as i told you earlier. Then again i book order of say 500 pcs then only it picks qty from those purchase orders.
Thanks
Deven
In the screen shot, the availability check is not even proposing a possible delivery date for the remaining quantity..
Is this a one case, or this is happening for other materials too?
Hope you are creating the new order and not running the availability check from the existing order after modification.
THanks
Jobi
Hi Jobi,
Actually we are testing the scenario where we need that sales order material should automatically pick the balance quantity from open purchase orders if that material quantity in sales order is greater than available stock quantity. But here in our case, when i make second sales order of say 500 pcs then only it picks the open purchase order quantity in my second sales order. The screenshots below will clear the picture -
First Sales Order (Picking the open stock quantity) -
Second Sales Order (Picking the open purchase order quantity) -
Your scope of check looks good to me. You sure checking group "Z3" is the group assigned to the material master? Maybe you care changing the wrong checking group?
Another possibility is that your sales order requirement exists at storage location or batch level. And your purchase orders only exist at plant level. The availability check looks at multiple segments and confirms the lowest segment. So you may have a requirement of 1000 in plant 1, storage location x. But your 1000 is available in plant 1, storage location y. It will not be available in storage location x so that requirement will not be confirmed.
If the above is not helpful, then a screenshot of CO09 would be useful.
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Hi,
Could you paste the screen shot of the Availability check from the sales order.
Thanks
Jobi
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
User | Count |
---|---|
104 | |
12 | |
11 | |
6 | |
6 | |
4 | |
3 | |
3 | |
3 | |
3 |
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.