cancel
Showing results for 
Search instead for 
Did you mean: 

Is it possible to change the measure during running storyboard

Former Member
0 Kudos

Hi Experts,

I have one question and not sure whether this could be done via SAP Lumira

Suppose I create one story board and it mixed with a bar chart which display GSV by year and a table which display NSV by year

When I running the storyboard, I want to change the bar chart meausre from GSV to NSV without changing the measure in the visulziation room

You could there will be a droplist which provide the meausre we could use

Could we do this in SAP Lumira?

Best regards

Alex yang

Accepted Solutions (1)

Accepted Solutions (1)

TammyPowlas
Active Contributor
0 Kudos

This type of scenario is better suited for Design Studio (in my opinion only)

I don't see how to do this in Lumira myself; if others don't have ideas I recommend posting this as an idea on Idea Place

Answers (0)