on 11-25-2014 4:21 PM
Hello All,
Looks like with EHP4, PDP wont happen using BBP_EXT_TRANSFER but
will happen using PI integration. Do we still have to maintain an entry channel
for local Pur Org, Pur Grp, RFC User??. Please throw some light.
Thanks,
Sachin
Hi Sachin,
From SAP_APPL 604 and SRM7.0 above, you can use SOA to transfer PR instead of report.
However report is still available for you to use it in such system version.
if you want to use SOA, please refer to the following doc to do configuration:
====
https://websmp207.sap-ag.de/support
Installation & Upgrade Guides
SAP Business Suite Applications
SAP SRM
SAP SRM Server 7.02
Configuration Guides for SAP SRM 7.0 EHP2
Here please download document "SAP SRM 7.0 EHP2: Plan-Driven Procurement"
From page 66, it talks about 'Settings for External Requirements from Enhancement Package 4 for SAP ERP 6.0 Onwards'.
===
Best regards,
Ivy
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Thanks Ivy for the useful info. Please confirm the two:
1. I don't think report BBP_EXT_TRANSFER can be used anymore on and after ECC EHP4. It has to be SOA.
2. Does one need to still maintain entry channels by creating local Pur Org, Pur Grp, RFC User etc in SRM org structure for PDP in ECC EHP4 onwards?
Thanks,
Sachin