Cproject -> PS replication. Incorrect status of transferred WBS elements

Former Member
0 Kudos

I am transferring unreleased phases and tasks from CProject to PS but in the PS all WBS elements have ==released== and ==master data lock== status. What settings should I check in order to keep the status in the PS same as in Cproject?

Accepted Solutions (1)

Accepted Solutions (1)

former_member201206
Active Contributor
0 Kudos

Hi Kiryl Bletsko,

in the cProject 4.0 there is unfortunetely no status mapping logic between cProject elements and the replicated WBS in the ERP PS. In other words, if the WBS elements are created, the status released (REL) and master data lock (MDLK). No standard functionality can change this system behaviour beside a Badi method, which has only the possibilty, not set the MDLK.

It is documented in the note 927960 & 1003599.

An own report to synchonize the status is from technical view no problem. If anyone has it, please post it.

Kind regards,

Zhenbo