on 11-18-2014 5:59 AM
Dear Team member,
My requirement:-
Country of departure will be used as first country in the transportation route.
Country of destination will be used as a second country (which is the last country in the routing we do actually).
Customs want to have detailsed route information
Present route like DE ....and..... TR
But we want DE- AT – HU – RO – BG - TR the details route which should come automatically.
§ My Route from Germany to Turkey needs to have 5 Stages:
1. DE to AT
2. AT to HU
3. HU to RO
4. RO to BG
5. BG to TR
And l need to create 6 Transportation Connection Points - one for each of those countries.
So what configuration needs to be done in R/3 ?
Thanks
Sits
In IMG, configure the 6 transportation connection points. After which you can Specify these as route stages under a specified route.
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Hi,
As the requirement of the Customs is to know the route just maintain the description of the Route as
DE- AT – HU – RO – BG - TR and the DE will be the Country code of your shipping point and the TR will be the Country key in the Customer Master Data and maintain the corresponding Route Determination.
The Other Country keys are not relevant for your Route since there is no other delivery is to be done for those country's as it is via through those points.
Let us know if any other information required.
Regards,
SRK
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
This message was moderated.
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
User | Count |
---|---|
100 | |
11 | |
11 | |
6 | |
6 | |
5 | |
4 | |
3 | |
3 | |
3 |
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.