on 11-14-2014 2:48 PM
Experts,
If I use "Dynamic mod. at Char. Level", and DMR in place. Is there a way that if the nspection plan includes diffrent characteristics,
Char. A should be skipped at every second lot
Char. B should be skipped at every tenth lot
that SAP allows diffrent skip sequence per Char. in one inspection plan, or place the diffrent DMR on Char. Level?
Thanks in advance
Jörg
Hi Joerg,
The DMR assignment is for individual characteristic. You can you 2 different DMRs in one operation.
Best Regards,
Rahul
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Hello,
I found this information from SAP Help:
" Dynamic modification at characteristic level
The decision concerning the next inspection stage is made at characteristic level.
You have two options for assigning a dynamic modification rule:
Dynamic modification at characteristic level
Regards,
Natália
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
User | Count |
---|---|
107 | |
12 | |
11 | |
6 | |
5 | |
4 | |
4 | |
3 | |
3 | |
3 |
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.