on 11-13-2014 3:35 PM
Experts,
I can not create Skip Lots using Source Inspection,
If I use Souce Inspection with ,
DMR,
the dynamic rule is visible at lots created via QI07, showing the stage
Unfortunately the inspection stage does not change as I expected, it starts with starting stage e.g. 1 but won´t change to the next stage, independent if I use “usage decision” or “at lot leve”l at dynamic rule.
How should the “std” system interact, where should the skip status occur?
Thanks in advance
Jörg
Hi Jorg,
You may check the following notes:
86925 - Skip Lots - Documentation.
844979 - Unintelligible inspection stage change
Br,
Nancy
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
I assume you created next inspection lot before UD for previous lot had been made.
If you want 2nd lot is skipped before UD for 1st lot, you have to set 'at lot creation' at DMR master.
Regards
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Hi,
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
User | Count |
---|---|
95 | |
11 | |
9 | |
5 | |
3 | |
3 | |
3 | |
3 | |
3 | |
3 |
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.