Experts,

I can not create Skip Lots using Source Inspection,

If I use Souce Inspection  with ,

  • Insp. plan  type 51
  • 0101 as inspection type  at Quality view Material Master
  • QI02 also with inspection type 0101, SI- no GR flagged
  •   Dynamic Rule at Lot Level

DMR,

  • Stage 1 Normal Insp;ISt flagged;Insp.Qty.1; A=Stage2, R=Stage1
  • Stage2 Skip flagged;Skip Qty 10; A=Stage2, R=Stage1

the dynamic rule is visible at lots created via QI07, showing the stage

Unfortunately the inspection stage does not change as I expected, it starts with starting stage e.g. 1 but won´t change to the next stage, independent if I use “usage decision” or “at lot leve”l at dynamic rule.

How should the “std” system interact, where should the skip status occur?

Thanks in advance

Jörg

Accepted Solutions (1)

Accepted Solutions (1)

Nancy
Product and Topic Expert
Product and Topic Expert
0 Kudos

Answers (2)

Answers (2)

former_member207800
Active Contributor
0 Kudos

I assume you created next inspection lot before UD for previous lot had been made.
If you want 2nd lot is skipped before UD for 1st lot, you have to set 'at lot creation' at DMR master.

Regards

Former Member
0 Kudos

Hello,

thanks for the answers, OSS 86925 reminded to about char. weigth, that solved the problem.

Best regards

Jörg

former_member190267
Contributor
0 Kudos

Hi,

Check if 'Skips allowed' indicator is activated in QM view in material master.
Regards,
Natália