on 11-12-2014 10:21 AM
Hi ,
I want to configure new company code under same controlling area , so want to know which point to be consider in terms of PS .
Thanks ,
Hi,
Please check below:
The list may not be exhaustive but can be used as a starting point.
Hope it Helps!
Thanks and Regards,
Varshal Kachole
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Hi,
use below transaction to company code assign to controlling area.
OX19 Assignment company code to Controlling area
I just let you know PS does not have own financial structure it use FI legal entity and logistic structure.
so come with specific PS query what issue you are facing.
Regards,
Sanjeev
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Thanks Varshal & Sanjeev for reply ,
My client have existing company code -1000 under controlling area 1000 now they assign the new company code 2000 to same controlling area 1000 . ( Client only gives requirement is they want copy all same settings like Company code 1000 to new company code 2000 for PS )
So just want to know which configuration steps I want to take in to consideration for new company code in terms of PS only.
@ Varshal - Let me check all point raise by you but let me know point be consider on Configuration point of view
Thanks ,
Virendra
Hi,
Response to your question on the Configuration Point of view:
No one other than you (or your teammates) will be in a position to provide any answer to this. This is because of the Client specific configutations and the business Processes involved.
Hope it Helps!
thanks and Regards,
Varshal Kachole
HI,
ok then create all structure as for 1000 or copy all parameter to 1000 company code.
and logistic side create plant and storage location and master data as was for 1000 company code.
then you create project wbs network as was created for 1000 company code.
PS side below configuration you have to do.
MRP controller you have create by OMD0 transaction.
Network type parameter
network scheduling parameter
availability check parameter
even check below link if helpful
SAP Project System — All about SAP PS
Regards,
Sanjeev