on 11-06-2014 8:26 AM
Hi Experts,
In one of the integration scenario I am working, I am connecting two SAP ECC system via PI.
SAP ECC 1 has got 3 systems in landscape - say,
1) A (Dev)
2) B (Quality)
3) C (prod)
SAP ECC 2 has got 5 systems in the landscape
1) D (Dev)
2) E (Quality 1)
3) F (Quality 2)
4) G (Regression)
5) H (prod).
Now during testing, system B needs to be connected to E, F and G in different phases. I have created a technical system and a Business system for B and connected to E.Its working fine.
Problem is when I want to connect B to F, I need to provide a different business system name for B for F (because its different env), If I try to create a new BS with same technical system name for B, I get a message that technical system for B is already being used for another business system.
Has anyone faced this issue. Any suggestion how to overcome this problem ?
Thanks,
Ravi.
Hi Ravi,
One of the possible solution is to have different client for ECC 1 system B. so you can create different logical system and Business system for different clients.
But if you not have different client then (assuming PI also had three systems A, B and C)
Add ECC receiver system F and G in receiver determination and create remaining configuration manually in QA system.
regards,
Harish
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
User | Count |
---|---|
87 | |
10 | |
10 | |
10 | |
7 | |
6 | |
6 | |
5 | |
5 | |
4 |
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.