on 10-28-2014 2:50 PM
Friends, I need a help.
We are setting the stage for the classic SRM 7 EHP03 with ECC 6 EHP7. After creating the cart or even the creation of the document request is not migrated to the backend system (does not perform follow-on).
Need to configure the interfaces on the PI (process integration), if yes, what would be?
Could tell me what I need to configure Badis, I need to check the information for the application to be migrated to the backend?
I thank you and look back.
Hi Pablo,
This depends on what scenario you are using and what kind of follow-on document you want to generate.
If you want to create PO from SC:
1, for classic scenario, PI can be used to transfer to ECC side.
2, for extended classic or local scenario, only RFC call is used (bapi_po_create).
Hope this helps.
Best regards,
Ivy
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
There is one badi which is used to transfer the po contents from srm to ecc
BBP_PO_*ECS*OUTBOUND_BADI
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Babukuttan,
Thanks for the feedback.
This BadI was not active. Activation of BadI realized but not yet send the document. So I just create it in BBP_PD status is as follows: Item in the transmission process.
No output message, log in SLG1 and no request is generated in the backend there.
Number range, I need to synchronize with the backend break somehow?
have any other tips?
Many thanks for the help.
I look back.
Hi Pablo,
The transfer can happen without PI through RFC calls. Please confirm if you are using PI or RFC for the transfer.
Ensure that the connection settings (RFC, etc have been setup properly).
Could you please check the error in the transaction RZ20.
RZ20 > SAP B2B Procurement Monitors > Shopping Basket
Hope this helps
Cheers,
Yateesh
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.