on 10-16-2014 5:53 AM
Hi all,
I have uploading(through GRAC_UPLOAD_MIT_ASSIGNMENTS ) Assignment of Mit. controls to users with 'Overwrite' , where only 1 entry is input in my file. So, it should overwrite all existing assignments, and only 1 entry should be finally present. However, NWBC still shows all assignments. But, table GRACMITUSER, shows only 1 entry, i.e of my file input
can anyone suggest, why NWBC still shows all assignments. Is there any sync, program further required from table to NWBC
Regards
Plaban
Hi Plaban,
With overwrite option, all the existing mitigation assignments would be overwritten as per the new data getting uploaded.
Could you try to log-off and relogin to see the changes, if get updated.
As you mentioned GRACMITUSER has only one data in there, then the same has to be there in NWBC as well. There shouldn't be any variation as such.
Cross-check:
If you have the data sheet of the old mitigation assignment, try to upload back and see if is getting reflected in NWBC. Again, upload the final data (with only one assignment) in overwrite mode.
See if this helps.
Regards,
Ameet