Dear Gurus,
I have came across one requirement, that user wants to ship goods before giving UD for the inspection lot which has created agaisnt production. This is required to save the time which taken to inspect the goods against the inspection lot. I have tried it by removing post to inspection stock in the inspection types, its working but still wants to explore more in a diffrent way.
I know this is not the standard SAP behaviour, but just wants the expert opinion from you guys.
Regards
Amit
What I have recommended to users is to receive the quantity to be shipped early into inventory. This results in the inspection lot creation. Now, without recording the usage decision, our QA group uses the Inspection Lot stock tab in the UD screen to manually post the quantity to unrestricted stock. The material is now available for shipping. The UD can be recorded after the material is released once the inspection is complete.
These steps allow for QA to show control over the quantity shipped early, document the total quantity of material posted and a complete inspection.
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Did you try to use 'early lot creation'?
If no, please check the insp. lot control field on insp. setup of material master.
Regards
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
User | Count |
---|---|
91 | |
7 | |
7 | |
4 | |
3 | |
3 | |
3 | |
3 | |
3 | |
3 |
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.