on 10-14-2014 6:39 AM
Dear All,
We are having SAP PO 7.4 system and it is connected one dedicated SLD system(Not solman SLD) and its connected and working fine.
Now the issue is we need to add PO 7.4 as technical system in solman SLD ,I ma having some doubts can any body clarify below points.
1) we need to add technical system we need to use template installer -configuration wizard
2) for this we need to disable function configurations and enable automatically then we need to provide the solution manager sld information while doing this any it will effect to exsisng sld (dedicated sld)
3) is it possible to connect po system to sld
Please suggest and guide me how to resolve the issue
Hi,
In your case, it is recommended that you configue data forwarding from current SLD to solman SLD or use Synchronization. The following documentation would be helpful:
SLD planning guide
http://scn.sap.com/docs/DOC-8042
Synchronization
SLD bridge forwarding
Thanks.
Jim
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
It's very simple, goto NWA and point the data-supplier to solman's SLD.
Once you get the information in solution manager of this technical system, chnage the settings in NWA in your PO system to old SLD where it was pointing.
Or, sync your old SLD with that of solution manager, i.e. from PO to solman.
Or, Add this SLD in solution manager and connect to LMDB with a lower rank that you have for local solman's SLD.
Regards,
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
User | Count |
---|---|
90 | |
10 | |
10 | |
10 | |
7 | |
7 | |
6 | |
5 | |
4 | |
3 |
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.