on 10-11-2014 5:41 PM
Hi ,
I am doing upgrade and getting an error in Pre Processing phase Error is
Severe error(s) occurred in phase MAIN_SHDRUN/JOB_RSUPDTEC_SHD!
Last error code set: RFC error system DV2 nr 01 function 'SUBST_START_BATCHJOB' failed with code 4 key No selections for program RSUPDTEC: No selections for program RSUPDTEC
A trouble ticket and an archive with all relevant log files have been generated. Trouble ticket: "E:\usr\sap\DV2\SUM\abap\log\SAPup_troubleticket.log" Log archive: "E:\usr\sap\DV2\SUM\abap\log\SAPup_troubleticket_logs.sar"
APup broke during phase JOB_RSUPDTEC_SHD in module MAIN_SHDRUN / Shadow System Operations: SPDD and Activation
Error Message: RFC error system DV2 nr 01 function 'SUBST_START_BATCHJOB' failed with code 4 key No selections for program RSUPDTEC: No selections for program RSUPDTEC
I need help. Please let me know if I need to add another group.
Thanks in Advance
Could you supply these logs please ?
PSUPDTEC.LOG
PSUPDTEC.SAV
PSUPDTECSHD.LOG
RSUPDTEC.<SID>
Also what is the version of the OS and DB ?
RB
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Thanks again.
Do I need to update the kernel only in Shadow instance or both or only main instance ?
The job status is SCHEDULE I can't change it to release even manually.
I didn't fine PSUPDTEC.ELG the only ELG I found is RIPACHK2.ELG and it has below.
~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~
REPACHK ERRORS and RETURN CODE in GET_INACTIVE_SAP_OBJECTS.DV2
~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~
4 ETG040 Start time.....: "09.10.2014" "19:59:37"
4 ETG039 -------------------------------------------------------------------------
4 ETG010 "11 inactive objects found" " " " " " "
4 ETG010 "2 inactive SAP objects" "colliding with import queue found." " " " "
4 ETG010 "Please contact the development team" "to either activate or discard the inactive object." " " " "
2EETG010 "The following objects are inactive" "in the system:" " " " "
2EETG010 "LIMU" "DYNP" "SAPLWSD_MATERIAL_SEARCH 0110" " "
2EETG010 "LIMU" "DYNP" "SAPLWSD_MATERIAL_SEARCH 0120" " "
First activate the inactive objects and see if that help.
The job is running in the shadow instance now so update the shadow kernel.
Check the version of the kernel present at E:\usr\sap\DV2\SUM\abap\exe
cd E:\usr\sap\DV2\SUM\abap\exe
disp+work -version
Update the kernel here to a supported version for EHP7
2EETG010 "The following objects are inactive" "in the system:" " " " "
2EETG010 "LIMU" "DYNP" "SAPLWSD_MATERIAL_SEARCH 0110" " "
2EETG010 "LIMU" "DYNP" "SAPLWSD_MATERIAL_SEARCH 0120" " "
Based on the log you provided the above two are the inactive ones. I am not sure whether activating them would help but it is worth trying.
As a reference follow SAP note 1882203 - SPAM : CHECK_INACT_OBJECTS error Inactive Objects for activating the objects.
As the job is running on the shadow system update the kernel to the latest patch set of 741 release. Use patch set 26 or 50.
Regards
RB
Thanks for the clarification.
I checked in SE80 I didn't see any inactive object there. I am using a latest kernel 741_rel
patch 26 in my shadow instance. The real instance has 740 kernel since it is not the upgraded one.
Any other suggestion. I also noticed the previous batch jobs ran for 1 minute but didn't show as canceled .
Any other help or suggestion will be helpful
Someone suggested that reset the logs, update SUM and restart the upgrade process. If I do that then I will loose 3 days of time plus I have to start my upgrade from scratch.
The latest patch level is 50 and you are on 26 for kernel 741.
Have you tried with that patch level ?
If you reset the upgrade then you will need to start all over again. Moreover there is no need to reset the upgrade if you don't know where the problem is and when you are not sure how to fix it. You will end up in the same state in the next execution.
If the background job is failing then check the work process trace file.
Try to restart the system and repeat the phase in SUM.
Hi,
I have just upgraded the kernel on a shadow instance to 7.41 64 bit rel 50 but it will give me same error. Kernel Patch number : 50
Do I need to upgrade the same kernel level to the real instance , however it's not upgrade and has EHP4 ?
At one forum I read that activate BUT000 . Do I need to do it ? how can I do it in SE80
Any other suggestion. I will appreciate it.
Thanks
I have given the possible suggestions based on the log files you have provided. You should also consider checking the work process trace files to know the reasons (if any) why the job is not getting executed. Additionally I would check the SAP profile parameters (especially the hostname related) like SAPGLOBALHOST and see if they should be adapted. If nothing works the raise an OSS message and check with SAP.
User | Count |
---|---|
84 | |
10 | |
10 | |
9 | |
7 | |
6 | |
6 | |
5 | |
4 | |
4 |
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.