on 10-02-2014 10:00 PM
Once buyoff is logged and accepted against the SFC there is NO way I can log the same buyoff again at the same operation for the same SFC (irrespective of the attachment point at the buy off maintenance)
Possible situation - SFC coming back to the same operation after repair and need buyoff again
RMA - same SFC needs the buy off again at same operation
please suggest possible way ?
Thanks
The only way to re-open an accepted buyoff is to reject that same buyoff. This is done by executing activity "REJECT_BUYOFF".
Not sure of your situation, but here is a scenario that works in 6.1. We have the same issue and Sergiy is right, it would be best if TIMES_PROCESSED was considered but here it is anyway...
1) You have an SFC at OPN1 and BUYOFF1 is attached to OPN1.
2) Open POD for OPN1, select SFC, execute activity "LOG_BUYOFF". Accept the buyoff.
3) Select the SFC again, execute activity "REJECT_BUYOFF". You must log a non-conformance for the SFC. Note: you must tie this activity to the POD button.
4) Select the SFC again, execute activity "LOG_BUYOFF". The buyoff has now been re-opened.
Joey
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
It really looks as if you are right and it is not possible now.
It needs an enhancement to include TIMES_PROCESSED value in a way similar to how this value is used for parametric data.
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
User | Count |
---|---|
100 | |
12 | |
11 | |
6 | |
6 | |
4 | |
3 | |
3 | |
3 | |
3 |
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.