cancel
Showing results for 
Search instead for 
Did you mean: 

muti bom

former_member1249468
Contributor
0 Kudos

hi gurus,i am interested in multi bom topic,but nobody is to guide me.i hope u people will send me the inputs.points will be awarded.

my mail id:pasapula.ravi@gmail.com

regards,

ravisankar.p

Accepted Solutions (0)

Answers (4)

Answers (4)

Former Member
0 Kudos

Hi Ravisankar,

MULTI LEVEL BOM

Create BOM as Below:

main material is 101(material No)

Subitems for 101 are: 102,103, 104 & 105

102 also has 2 two sub items i.e., 106 & 107

create material masters for all the items i.e., 101 to 107 and posted stocks and maintain prices individually in VK11.

create BOM in CS01 seperately for 101 & 102

change the Item Category Group for both the main items 101 & 102 from NORM to ERLA/LUMF and create the Sales Order.

For 101 BOM will explode correctly in order but for 102 will not explode.

If you enter both the materials 101 & 102 as 2 line items then BOM will explode for both the materials.

To solve this:

check the Item category configuration for your header material for the following field:

Structure Scope: whether it is A or B...A is for explode single level & B is for explode multi-level bill of material. In your case, it should be maintained as "B"

If it is changed you can explode Multi-level BOM

Reward if it helps

Regards

Srini

reazuddin_md
Active Contributor
0 Kudos

Hi Reddy,

As we know, BoM- Combination prdocusts together know as One prdouct is called BoM.

material : Music sytem(Main Item) which Includes

Sub Items--1)Speaker Stands 2) Connecting wire -5 mtnrs(2 quantity)

Now Create Music System, Speaker Stands ,Connecting wire in MM01, individually as per their material type.

Maintain Main Item, Item cat group- ERLA( if u want to give price per music system) & Sub Item, Item cat group-NORM(trading goods)

R

Maintain Main Item, Item cat group- LUMF( if u want to give price per sub items individually)& Sub Item, Item cat group-NORM(trading goods)

now Combine the materials(Create BoM)- CS01

Enter ur main item,

Plant

boM usage: 5 (SD)

press enter,

here enter ur subitems viz,

Speaker stands-- qtty( as per ur req)

connceting wire-- qtty( as per ur req)

& Save . ( Bom Has been created)

Maintain the stock for main item - if u want to sell only music systems.

Maintain the stock for all items- if u want to sell all items individually

Maintian the Condtion records for the materials in VK11.

Tcode:va01 create SO.

as i told u above statement,

if u want to price the material @ main item level:-

as per standard sap config,

Main item Item cat: TAQ (rel for pricing, structure scope-explode single level Bom)

Sub item item cat: TAE (not rel for pricing, no structure scope)

price the material @ sub item level:-

as per standard sap config,

Main item Item cat: TAP (not rel for pricing, structure scope-explode single level Bom)

Sub item item cat: TAN (rel for pricing, no structure scope)

*hope it helps U.

*POINTS AS REWARDS.

Former Member
0 Kudos

Multi Level BOM Conceptually:

For Eg: Computer

Level 0:

Computer

Level 1:

Monitor

CPU

Speaker ...

Level 2:

Compoment & Parts of Monitor.

Compoment & Parts of CPU ...

Level 3:

Further break down of components to a decided or lowest level.

For Sales BOM.

Menupath: Logistics --> Sales and Distribution --> Master Data --> Products --> Bills of material --> Bill of Material --> Different Options available.

Regards,

Rajesh Banka

Former Member
0 Kudos

hi.,

For multi level BOM for ERLA

orerlanil+nil=taq

orerlanil+taq=taq

ornormnil+taq=tae

ornormnil+tae=tae

And in item category TAQ structure scope is B and application is SD01

For multi level BOM in LUMF

orlumfnil+nil=tap

orlumfnil+tap=tap

ornormnil+tap=tan

ornormnil+tan=tan

And in item category of TAP structure scope is B and application is SD01

Reward points if helpful