on 09-16-2014 5:14 AM
Hi Everyone,
I have recently done EHP 7 upgrade along with HR Renewal 2.0(MSS was there before and this is no longer supported by EH7) in the development ECC system and found that the HR renewal was not perfomed during the actual upgrade using SUM tool. but i could see them availabl in SAINT tool and performed the HR renewal after the EHP 7 was upgraded
my question is, can't we include HR renewal 2.0 also with the actual EHP7 upgrade, so that it wil be applied with the single downtime. because it is upgrading SAP_HR and EA_HR from 604 to 608, it is running for more than 8 hrs and i dont want this to happen in the Test envioenmnet
This is very critical and I really appriciate immediate response
Thanks,
Shiv
As far as I know it is possible to update the SAP_HR and EA_HR to the target level. I believe you need to include them (HCM components or Add HR packages) in the stack file while generating it.
Regards
RB
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
can anyone please let me know what should i understand from the following warnings from MOPZ
1.It is required to update to EA-HR 607 SAPK-60726INEAHR to avoid functional downgrade for RED-rhsdsqloc01 (target SP stacks contain SAPK-60723INEAHR )
2.Upgradable add-ons for MSS ADD-ON 1.0 are not in the installable add-on list - This is because MSS does not support EHP 7. I have selected HR renewal 2.0 as this is its next Version of MSS
3.Component RWD HELP LAUNCHPAD 4300_700 without suitable Product Instance
4. Component BP-SOLBLD 70V3 without Product Instance
5. Component BP-ERP 604V5 without Product Instance
6. Software Component Version EA-HRCQA 606 unknown
Thanks,
Shiv
Hi Shiv
You can refer the SCN & SAP Notes
1958062 - Create Product System Automatically in the LMDB
1679673 - LMDB System Landscape Product System: Comparison with SMSY
Regards
SS
I am confussed. the below screen shows EA-HR 607 only till 14. but the previous MOPS warning suggested to go till 607 26. what is "EA-HR 607 Upgrade" means. even if this upgrade, it will do only till 23 then how can i include the package 24,25,26 as recommended by MOPZ. should i uncheck EA-HR 608 components and re do the upgrade??!!
"It is required to update to EA-HR 607 SAPK-60726INEAHR to avoid functional downgrade for RED-rhsdsqloc01 (target SP stacks contain SAPK-60723INEAHR )"
Please advise
Thanks,
Shiv
Hi Shiv
Could you refer the SAP Note for HR 2.0 Release information
1965692 - HR Renewal 2.0: Release Information Note
BR
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Hi Shiv
Could you check the EHP 7 SP Stacks information. Are you calculate the SP stack from Solution Manager? what is the version of Solution Manager?
1737650 - EHP7 for SAP ERP 6.0 SP Stacks - Release & Information Note
BR
SS
Hi Shiv,
The landscape pattern depends of the other system and their integration with your ECC system.
If you having problems in generating, make sure correct association are done in LMDB. You may run verification check and see for suggestions.
Also, I would suggest to use SUM in place of SPAM/SAINT.
Regards,
Divyanshu
Hi Divuanshu,
Not sure if you read my query. just to brief you, i am having problem including HR renewal 2.0 add-on to the EHP 7 upgrade. even i want to use SUm instead of SAINT/SPAM. i was able to do the EHP upgrade using SUM tool but although HR renewal was selected during MOPZ and available in the EPS/IN folder, the SUM tool did not apply them during DOWNTIME. instead, i could see them available in the SAINT. then ii had to do a manual SAONT upgrade for HR renewal. wanted to check if this is the normal proces to apply HR renewal 2.0 or we can make SUM to appl them along with the EHP 7 upgrade.
Please give specific answers rahter thean genral
Thanks,
Shiv