on 09-15-2014 6:47 AM
in CA03, we maintain setup activity type L001, base qty 1000 g , time 30 minute (0.5 hour) for work center Z001.
our costing lot size is 20000 g, in ck13n, if we choose costing lot size, it shows activity type L001 for work center Z001 is 0.5 hours(this is not correct)
if we choose "user entry" to be base qty in CK13N, it shows activity type L001 for work center Z001 is 0.5/20=0.025 hours (this is not correct)
the correct one should be: in CK13N, user entry: 1000 g (base qty), activity type L001 hours: 0.5 hours.
I don't why the error happens. any expert can answer, thanks
sorry costing lot size is 150,000 g, 0.003=0.5/150, which is wrong, it should be 0.5 for base qty 1000 g
anyone know why the activity type qty in CK11N is wrong for base qty 1000 g? thanks
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
No one change routing,
can you answer my question, this is standard SAP.
My question is : in ca03 routing, in my case 30 minutes for activity type quantity, this is based on base quantity or costing lot size?
if based on based qty, why ck11n didn't rollup hours to become costing lot size/base qty*30 minutes?
Hi, this is based on base quantity not costing lot size.
ck11n will rollup this cost depending on your setting, it can be costing lot size/base qty*30 minutes or 30 minutes regardless operation qty, SAP_11 it will be SAP operation split, thus 30 minutes in your case not costing lot size divided by base qty.
Hi
Check formula for activity types
Rajneesh
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.