costing error for base qty

Former Member
0 Kudos

in CA03, we maintain setup activity type L001, base qty 1000 g , time 30 minute (0.5 hour) for work center Z001.

our costing lot size is 20000 g, in ck13n, if we choose costing lot size, it shows activity type L001 for work center Z001 is 0.5 hours(this is not correct)

if we choose "user entry" to be base qty in CK13N, it shows  activity type L001 for work center Z001 is 0.5/20=0.025 hours (this is not correct)

the correct one should be: in CK13N, user entry: 1000 g (base qty), activity type L001 hours: 0.5 hours.

I don't why the error happens. any expert can answer, thanks

Accepted Solutions (1)

Accepted Solutions (1)

Former Member
0 Kudos

sorry costing lot size is 150,000 g, 0.003=0.5/150, which is wrong, it should be 0.5 for base qty 1000 g

anyone know why the activity type qty in CK11N is wrong for base qty 1000 g? thanks

Former Member
0 Kudos

is there anything wrong with my routing setting?

Former Member
0 Kudos

My question is : when we do cost rollup, ck11n, activity type quantity is directly getting from routing, in my case 30 minutes or costing lot size/base quantity* 30 minutes?

anyone can explain ?

former_member198650
Active Contributor
0 Kudos

Hi Siva,

Check in the routing master data, have some body has done any changes after run the CK11N.

Regards,

Mukthar

Former Member
0 Kudos

No one change routing,

can you answer my question, this is standard SAP.

My question is : in ca03 routing, in my case 30 minutes for activity type quantity, this is based on base quantity or costing lot size?


if based on based qty, why ck11n didn't rollup hours to become costing lot size/base qty*30 minutes?

Former Member
0 Kudos

Hi, this is based on base quantity not costing lot size.

ck11n will rollup this cost depending on your setting, it can be costing lot size/base qty*30 minutes or 30 minutes regardless operation qty, SAP_11 it will be SAP operation split, thus 30 minutes in your case not costing lot size divided by base qty.

Answers (2)

Answers (2)

rajneesh_saxena
Active Contributor
0 Kudos

Hi

Check formula for activity types

Rajneesh

Former Member
0 Kudos

my formula is Z000001= SAP_01*SAP_11, anything wrong?

rajneesh_saxena
Active Contributor
0 Kudos

Hi

Formula should be as below

(Operation time X Operation Qty)/Base quantity


Rajneesh

Former Member
0 Kudos

below is the setting of routing, base qty:1000 g, hours: 30 minutes

ck11n for costing lot size 150000

ck11n for base qty 1000