on 09-09-2014 12:19 PM
Dear Members,
Installed a test PI 7.11 system and restored primary PI DEV system backup on to the test PI system and then the test PI 7.11 system was upgraded to PO 7.4 dual stack system. Done with the post up-gradation activities and the test PO 7.4 system was up and running.
Now, all the ID config objects in the upgraded test PO 7.4 system remained as classical scenarios with sender agreement, receiver determination, interface determination & receiver agreement etc.,
Need a clarification here i.e., how to change the existing classical scenarios to ICo objects in the upgraded PO 7.4 test system..? Do we need to delete the existing sender agreement, receiver determination, interface determination, receiver agreement objects and manually build ICo objects for the respective scenarios (or) do we have any other alternative.
I suppose that the Content Migration Tool doesn't suffice my requirement, as the new PO 7.4 system is not a parallel system built against the existing
PI 7.11 system. I directly performed the upgrade activity on the test system and not on a parallel built system.
In this case, can someone advice how to change the existing classical scenarios to ICo objects i.e., manually (or) do we have any other alternative.
Br,
Saiganesh
1. If you have 7.40 dual stack than it's not PO (Process Orchestration) but still PI.
2. You can use Migration Tool to transform your existing classical scenarios to ICO's. On the same system. It's the one of thу major features of Migration tool.
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
User | Count |
---|---|
93 | |
11 | |
10 | |
9 | |
9 | |
7 | |
6 | |
5 | |
4 | |
4 |
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.