CAPACITY PLANNNING ISSUE

0 Kudos

Hi experts,

In CM22 if i want to do capacity levelling of an process order then it is showing "operation as well as phase" in requirements section.I have put value 1.5 hr in setup activity in recipe.Now if i am doing capacity levelling it is showing requirements as 3 hrs not 1.5 hr as it is doubling the time as it is also including operation there 0010.Is there any setting for excluding operation.If i am excluding operation by control key then it is not allowing phase to dispatch.

Plz help

Accepted Solutions (1)

Accepted Solutions (1)

Caetano
Product and Topic Expert
Product and Topic Expert
0 Kudos

Hello

Transaction CM22 was not designed to be used with process orders. Phases are not relevant for capacity leveling and should be be dispatched (only the operations).

Try again using transactions CM35 or CM37. CM29 can be used for graphical capacity leveling of process orders.

BR

Caetano

Answers (1)

Answers (1)

kiran_kumar179
Active Contributor
0 Kudos

Amit,

But in your snap shot it is showing 2 different operation requirements(0010,0020) each 1.5H?

Br

KK