Dear Experts ,
I need your expertise knowledge in Re-work scenario for configurable product.
I have a scenario where i have produced one configurable product which is lying in stock against specific customer.
Now at some point of time , i came to know that this product can be sold to some other customer with just change in the few variants like color and
Cylinder capacity. In this kind of scenario , to carry our re-work process my business wants to consume the stock lying against different customer in
stock ( hopefully customer delaying to get it delivered) Is this the right approach..? Can i consume the configuarablke material stock and make few
changes and deliver to the customer..? Is this the right approah.
Need you expertise knowledge on impact of both Finance. Production.
Note : i have tested the scenario , system is allowing me to consume Stock of configuarable product ( For testing purpose i did transfer posting from customer stock to own stock by 411 E.
regards,
Daya
Hi experts,
Waiting for your inputs on this.
Regards,
Daya
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Hi Daya,
To understand myself the above scenario, I used the
example of Tined drinks/beers. The product beer is going to be the same for the
brands UB and Kingfisher, only the difference is brand sticker pasted over the
tin.
Now, the retailer of UB had placed some order and the
stock for them is produced as well and available at UB sales order stock. In
business perspective it is required to remove the UB sticker from tin and paste
the kingfisher stickers over it.
In the above structure, I hope there is no standard SAP transaction available for links in colour red(For dis-mantle and re-assembling). All the links in Green are available in standard SAP. If the scenario is often occuring, then it is good to have a custom program for this in the below mentioned way.
Step 1
The final product (UB Beer), to dismantled to beer and UB sticker (may be 132 and 262 - Consumption reversal), here it is possible to custom single level or multi level as well - The cost of dismantling also to be capture in a seperate cost center (may be a re-work cost center).
Step 2
Assemble the Beer and KF sticker (131 and 262) - Assembling cot needs to be captured in seperate cost center if required. Or for ex, if this stickering operation is defined as a seperate level of process, then this can be handled by cretaing a regular production order.
This dis-mantling custom program can be used for scrapping as well, for ex, the final product is rejected and needs to be scrapped for some reason, But some of its components are re-usable.
This dismantling and re-assembling is very often in breweries as there would be lot of promotions and discount sales will be going on and to push the produce stock it is required to go with the brands which is selling high in a particular season.
But it is good to go for custom program only if the dis-mantling and assembling is often in the business process. Other wise it is better to split the configured product into two process like
Process 1 - Until the configuration come into place, produce the product at this level in MTS scenario
Process 2 - Pick the MTS product and go either for ATO or STO scenario.
Let the community know any further inputs are required.
Regards,
Chinna.
HI Chinnaveer ,
Thanks for your reply/ valuable suggestion.
The process is quite irregular and not regular.
So have decided to carry out the process with Creating re-work order without material (CO07).
Now i have a question here , can i settle this re-work cost to New sales order for which i am re-working.
i tried creating re-work order , by assigning category " SDI " and entered the relevant sales order number/line item as settlement receiver i am facing the following issue , could you please help me on this.
Message no. BS051
The status check for the status object VB0000015650000010 indicated that the procedure "Settlement account assignment" cannot be performed because Sys. status NoMP forbids it.
Procedure "Settlement account assignment" is not performed.
If procedure "Settlement account assignment" is to be performed, the Sys. status NoMP of object VB0000015650000010 must be reset.
Other statuses than Sys. status NoMP can also prevent the procedure. This message does not tell you all statuses which currently prevent procedure "Settlement account assignment".
Could you please help me out with this.
Regards,
daya.
Hi Daya,
On the first look of the message, I believe there is a status profile attached to the sales order line item and it is marked for “No MP”.
So could you please check the system status of the sales order line item in status tab and set it to the status which allows the settlement and re-try .
But, If you want to settle the re-work cost to the incoming sales order, then it is advisable to go for a regular reciept element (Production order - After running MRP), then include the rework as the last operation with required time and work center details. Then if you go for confirmation, I hope system will take care of the settlement of this re-work as well into the SO costing, incase if the previous operations are not required then it can be deleted from the production order.
Please get back to the comunnity in case any further queries.
Regards,
Chinna.
User | Count |
---|---|
103 | |
12 | |
11 | |
6 | |
6 | |
4 | |
3 | |
3 | |
3 | |
3 |
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.