In Variant configuration planned order conversion says no routing available

Hi!

I have a super routing to which I have assigned selection conditions to select the routing according to the configuration. The selection conditions are active also. After creating a sales order for the header configurable material I ran MRP for it which created planned orders for the BOM items. Now when I try to convert the planned orders to production order for the BOM items I get the following errors for all of them.

No routing found:

Material                   T_4S_ENGINE

Plant                        1000

Quantity                   5 PC

Explosion date         05.09.2014

Also when I tested the configuration in CU50 I get the following result which is correct according to my selection conditions. But in description space for the material it's gives the description that belongs to one of the BOM items. See picture below. The description is supposed to be 'Configurable Material for Motorcycle' which is the header material.

Even though if I have a super routing should I still create routing for BOM items?

Could you please help me how to solve this.

Best Regards,

Thileepan P