cancel
Showing results for 
Search instead for 
Did you mean: 

Integration with EWM-Inspection lot not getting created

ajeyagv
Participant
0 Kudos

Hi,

Inspection lot not getting created after GR is done.

The scenario is Storage location is connected to external warehouse management,so after the GR is done in the legacy system via interface it is updated in ECC.so while checking the material document inpection lot is not created.

Can anyone please tell me the necesaary check points and integeration steps  between WM and QM in this case .

Thanks in advance.......


Accepted Solutions (0)

Answers (3)

Answers (3)

Former Member
0 Kudos

Hello Ajeya

Conditions to activate quality inspections are: MM movement type must be QM relevant and material must be inspection type activated.

Regards

CD

Former Member
0 Kudos

Hello,

For inspection lot creation you need to activate inspection type in MM- QM view.

Regards

nitin_jinagal
Active Contributor
0 Kudos

Hi,

Since you didn't say much, I assume you are creating stock into ECC via LSMW using 561 movement. Now to get inspection lot for these batches/ docs, you need to activate inspection type 05.

Go to material master QM view, assign and activate inspection type 05.

Additionally, create a respective inspection plan/ task list for the material(s) to carry out RR and get the consistent inspection lots.

ntn